Sunday, March 12, 2017

The final countdown

Almost there!

Our requirements for our initial outing are to have the walls complete, ceiling, flooring and a bed
platform installed. With only two weeks and one full working weekend to get the van ready for our 10 day trip to Arizona, we hustled this week to get the electrical panel, lighting, panel upholstery and flooring in. Unfortunately, the floor covering material may not arrive in time for our inaugural trip, but at least we have the subfloor laid in.

Not sure if we will get bed platform installed, it all depends on when the IKEA beams show up. The closest IKEA is 3 hours away so I had to use their eCommerce site, which doesn't offer expedited shipping. We may have to sleep on the mattress on the floor, but it will be a far cry better than the ground I presume.

In an effort to create some time for prepping our motorcycles and gear, I am going to have our local conversion guy install our house battery and seat swivel, since both require removal of the front seat. He is reliable and has great rates and at this point anything I can do to save myself some time is helpful.




No comments: